Julie labored on our computer all afternoon, trying to get a printing program to work for a project she was doing for a baby shower.

Jesse insulating bathroom walls around the water pipes.

Kevin, cutting a hole in the drywall.

Jesse putting up insulation on the outside of bathroom wall.

Jesse very handy with the staple gun.

Kevin, screwing in the drywall on outside bathroom wall.

Kevin measuring insulation to cut.

Jesse doing the same.

Kevin and Jesse drywalling bathroom ceiling.

That piece got heavy!

Outside the bathroom and looking down the hall. It looks beautiful to us! ...because it's progress!

No comments:
Post a Comment