Here's the latest on the basement progress. Kevin just keeps at it...with patience, endurance, tenacity, and problem solving.
Here's the view of the hallway. Bathroom behind the left door, rec room to the right. Kevin's art studio is down the hall and to the right and storage is at the end of the hall and through the door on the left.
Bathroom drywalling is finished.
Looking up the stairs that lead to our dining/kitchen area. Bar, and then hot water heater and laundry on through just to the right of the stairs.
Close up of the bar. The bar was part of a hutch that Kevin had. He fit the sink into a hole he cut out. Looks great and it saved $.
Measuring for holes to be cut.
Kevin rented a drywall jack to help with the installation of the ceiling. Proved to be well worth it.
I was working too, while Kevin was putting up drywall. I made carmel corn. Can you smell it?
Back to the basement...hoisting up a sheet of drywall for the ceiling in his studio.
This screw gun has been a great investment. Kevin offered to let me try it, but it proved to be way too heavy to hold up, let alone trying to actually drive those screws in place. So instead, I just picked up the screws he dropped. Hey!! I was helpful!
Hundreds of screws.....
Thursday, March 23, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment